We Have Solutions For All Phases Of Construction

Phase 1: Pre-Construction

  • Pre-Design Surveys
  • Construction Documents
  • Plans and Details
  • Bidding Services
  • Peer Reviews
  • Submittal Reviews

Phase 2: Construction

  • Quality Assurance Observations
  • Infrared Surveys (ASTM C-1153)
  • Water Spray Tests (AAMA 501.2)
  • Static Air and Water Testing (AAMA 501 AND ASTM E-331)
  • Pull Out and Adhesion Testing (ANSI/SPRI FX-1-2001 AND ASTM D4541)
  • Wind Uplift Testing
  • Contract Administration

Phase 3: Existing Buildings

  • Visual Roof Surveys
  • Building Envelope Surveys
  • Roof Management Databases
  • Leak Investigations
  • Infrared Surveys (ASTM C-1153)
  • Water Spray Tests (AAMA 501.2)
  • Pull Out and Adhesion Testing (ANSI/SPRI FX-1-2001 AND ASTM D4541)
  • Wind Uplift Testing
  • Core Cuts
  • Litigation and Expert Witness
glqxz9283 sfy39587stf02 mnesdcuix8
sfy39587stf03
sfy39587stp14